Developer Guidance

Structuring site control for hot rock systems.

Engineered geothermal systems (EGS) and closed loop projects have different real property requirements than traditional oil and gas leases or surface solar farms.

The geothermal site control architecture

Securing ground for deep geothermal circulation requires assembling four distinct legal layers across your project area:

1. Surface Drilling Pad

A primary surface lease (5 to 15 acres) providing exclusive possession for drilling rigs, wellheads, heat exchangers, binary cycle generation units, and switchgear.

2. Subsurface Lateral Envelope

Subsurface easements across target crystalline formations to permit horizontal wellbore drilling, fracture creation, and working fluid circulation.

3. Buffer & Setback Parcels

Surface and subsurface accommodation on adjoining tracts to establish protective buffer corridors and prevent boundary trespass claims.

4. Interconnect Corridors

Linear right-of-way easements connecting the generation pad to regional electrical transmission facilities and dedicated water supply pipelines.

Navigating split estates and oilfield accommodation

In mature energy basins, the surface estate and mineral estate have frequently been severed for decades. Developers must address the legal relationships created by severance:

Federal, state, and private land regimes

Site control procedures vary significantly based on land jurisdiction:

What to send to initiate project scoping

When contacting Our Landmen LLC for a title examination or site assembly project, having the following starting parameters accelerates scoping:

  1. Target Geography: County, state, and nearest municipality.
  2. Acreage Boundaries: Section/township/range coordinates, Texas survey abstract numbers, or GIS shapefiles/KML boundaries.
  3. Subsurface Target: Approximate target depth and whether you plan an open-fracture EGS doublet or a closed-loop wellbore system.
  4. Development Timeline: Expected drilling schedule, option period requirements, and financing milestones.

Initiate developer scoping Access site-readiness brief